[Case Study] Neutralization Treatment of High-Temperature Boiler Drainage
Introducing a case study of neutralizing 80℃ boiler drain water in a space-saving manner.
A major plant engineering company consulted us about installing a high-temperature alkaline boiler wastewater neutralization system in a new building in Tokyo, seeking a space-saving solution. The space for the neutralization process was very limited, so we devised various strategies to optimize space usage. Additionally, due to the need for complex temperature management, we implemented a dedicated touch panel control for the site. This was evaluated as making site management significantly easier. [Case Study] ■ Delivery: A certain high-rise building in Tokyo ■ Application: Neutralization treatment of 80°C boiler wastewater *For more details, please refer to the PDF document or feel free to contact us.
- Company:エイチツー
- Price:Other